SB Enterprise Help Center

UB Resequence Meters

Updated on

Summary

The Resenquence Meters window is used to update the sequence in which meters are read. This process can be used to correct sequence entry errors that occurred when the sequence was first established, to insert new meters into an existing route sequence, and to update a sequence for efficiency or meter reader preference.

This process is generally run only if the meter reader changed the read sequence while conducting the meter reads. After the new meter reads are imported into the system, the same meter read file is used to update the meter sequence in the application.

Step by Step

 

1     Open the Resequence Meter window (UB> Meter Management> Resequence).

 

2     Resequence the meters.

  • Select the meter manufacturer layout you would like to resequence from the Layout drop-down menu.
    • Click the Display Report Layout icon at the top of the window to display the expected file format of the selected manufacturer.
  • The Input File field is used to enter the path of the meter reading import file. Click the Input File field label to select the file from a window.
  • Click the Confirm icon to import the meter reading file and update the meter sequence in the application.
    • You can also enter a date and time in the field next to the Confirm icon to schedule the import to process at a later time. You can view the progress of the import on the Job Viewer window (SS> Utilities> Show Scheduled Jobs).
Previous Article UB Import Meter Readings
Next Article UB New Billing
Still Need Help? Contact Us