SB Enterprise Help Center

UB Meter Sheet

Updated on

Summary

Meter Sheets Report is list of meters filtered by meter read route and is used to manually record meter readings. If meter readings are imported you probably will not use this report. The Meter Sheets Report displays a list of Active meters that are attached to customer accounts and is sorted by meter route and route sequence number. A meter will not display on the report if it has been removed from a UB customer account using a remove meter service request.

After meter readings are entered on the meter read sheets, the reading can be manually entered in UB> Maintenance> Input New.

Step by Step

 

1     Open the Meter Sheets window (UB> Meter Management> Meter Sheets).

 

2     Configure the report.

  • Select the meter routes to include on the report.
    • Press CTRL+ A to select all of the meter routes. Press SPACE to check or uncheck all of the toggles in the field.
    • Meter routes are created and maintained in UB> Maintenance> Route.
  • Check the status of the accounts you would like to include on the meter sheets.
    • You can view the status of an account in UB> Maintenance> Account> Account tab> Account Status field.
  • The Meter sheets will display the route number, sequence number, customer number, reference number, account status, service address, customer name, meter serial/MXU/register number, begin read, a blank space for new reading, meter location and a blank area for comments.
    • The New Reading and Comments column on the report are used to enter the meter reading and notes.
    • The reference column is pulled from the Reference field found in UB> Maintenance> Account> Account tab.
    • The location column on the report will display the location of the meter at the address it is installed at.
      • You can view the location of a device in UB> Maintenance> Device> Connections tab> Location field.

 

3     Print the report.

  • Click the Print icon   to process the report immediately or enter a date and time in the field next to the Print icon to schedule the report to generate at a later time. You can view the progress of the report on the Job Viewer window (SS> Utilities> Show Scheduled Jobs).
    • Click the Print icon drop-down menu and select Print Preview to preview the report before printing.
    • Click the Print icon drop-down menu and select Excel to export the report data to an Excel spreadsheet as unformatted data.
    • Click the Print icon drop-down menu and select Excel (Formatted) to export the report data to an Excel spreadsheet that includes much of the Springbrook formatting found on the printed version of the report.
    • Once the report is generated, you can also display the report using the View Reports window (SS> Utilities> View Report).
Previous Article UB Unread Meters Report
Next Article UB Meter Data Export
Still Need Help? Contact Us